Facility hardware facilities | Spec. Detailed data | Equipments device | Remarks notes |
Dry Dock Shipyard | 300*45*13m | 2*400T crane | with 100*50m weather shelter 100*50mShelter |
Slipway slipway | 120*32m | 2*100T | inclination=1.2%-1.7% slope 1.2%-1.7% |
Mega block erection area Loading area | 300*45m | 1*160T,2*100T, 2*400T |
|
SUS structure workshop Stainless steel structure workshop | 80*35*21m | 2*16T, 2*100T |
|
Tank fabrication workshop Tank making workshop | 80*18*21m | 2*16T, 2*100T |
|
Painting workshop PAINT SHOP | 3, 26*30*16m |
|
|
Blasting workshop Sand blasting workshop | 25*33*16, 25*27*16 |
|
|
Steel storage area Steel storage yard | 48*60m | 1*15T |
|
Steel Cutting&Assembly workshop Cutting&Group Workshop | 45*90m | 3*10T |
|
Block fabrication workshop Segmented workshop | 2, 35*140m | 4*160T, 6*16T | ready by July, 2025. |
Plate processing workshop Sheet metal processing workshop | 15*80m | hydraulic press.1500T |
|
Machining workshop Machining workshop | 15*50m | lathe, drill, miller |
|
SUS piping fabrication workshop Stainless steel pipe processing workshop | 20*50m |
|
|
carbon piping fabrication workshop Carbon steel pipe processing workshop | 2, 20*100m |
|
|
Quay wharf | 550m,depth=13m | 1*30T@70m, 1*40T@60m |
|
Equipment Warehouse Equipment warehouse | 48*50m |
|
|
block outfitting area Segmented outfitting area | 35*110m | 1*160T |
|